JOHN'S PASS SEAFOOD FESTIVAL MAR. 28 - 30

2025 RESIDENT PARKING PASS REGISTRATION

HVAC Elevation

Posted on March 3, 2025


IMPORTANT NOTICE- HVAC CHANGE OUTS DUE TO FLOODING- The exterior condenser MUST be elevated at least 30” above grade, on a stand that is designed to withstand WIND AND FLOOD loads.  Please upload stand manufacturer installation instructions or poured in place foundational details to include anchoring methods.

HVAC Elevation

Close window