There will be a scheduled water shut off please see below for the residents effected, date, and time. At this time there is not a boil water notice. November 23, 2020 9:00am – 3:00pm Crystal Dr. Flamingo Ave Lillian Dr Johns Pass Ave. If you have any questions please reach out to the Public Works … Continued
The curbing project for Crystal Island Drive will resume Nov. 23. Residents will see crews installing curb on the east sides of the roadway (north bound lane). The three-phase process will involve digging out the side of the roadway, installing the curbing, and then cutting the curbing to allow access to residential driveways. During this … Continued
Crystal Island Roadway / Drainage Schedule Monday November 16th – Friday November 20th Lillian Dr. Irrigation Restoration Copper water service lines replaced Johns Pass Ave. Irrigation Restoration Restore Driveways Flamingo Dr. Restore Driveways Reclaim water offset Pump Station Valve Replacement Crystal Dr. Sub-Base and Base South of Flamingo Drive – Existing Base Prep for curb pad … Continued
City Hall will open at 9am tomorrow, November 12th, to allow out staff to stay safe. Normal operation will resume Friday, November 13th. Public Works will be assessing damage starting at 7am as long as conditions are safe for our staff. Please report any debris blocking roads to Public Works: 727- 391-9951. All Crystal Island … Continued
During the week of November 9th, Gibbs & Register will continue the installation of curb on Crystal Drive, residents will see crews installing curb on both sides of the roadway. The three-phase process will involve digging out the sides of the roadway, installing the curbing, and then cutting the curbing to allow access to residential … Continued
ATTENTION During the week of October 26th, Gibbs & Register will continue the installation of curb on Crystal Drive, residents will see crews installing curb on both sides of the roadway. The three-phase process will involve digging out the sides of the roadway, installing the curbing, and then cutting the curbing to allow access to … Continued
As part of the Crystal Island Roadway Improvements, contractor will be paving on Monday October 19th & Tuesday October 20th John’s Pass Ave – from 536/539 to 582/585 & Flamingo Drive – all (from John’s Pass Ave to Crystal Dr.) Please note above dates are contingent on weather. No Parking will be permitted within the … Continued
Beginning the week of October 5th, Gibbs & Register will continue the installation of curb on Flamingo Drive, residents will see crews installing curb on both sides of the roadway. The three-phase process will involve digging out the sides of the roadway, installing the curbing, and then cutting the curbing to allow access to residential … Continued